Loading...
Crew on scaffolding

Around the main work

Paint fails if the repair underneath is rushed.

General repairs are what the building needs around painting and external insulation: cracks, loose plaster, wall fixes, prep before paint, small items that appear once work starts.

We are not a crew for every trade in the house. We are the crew that does not leave main work on top of a hole. Whatever we take on, we finish the same way, small or large.

Who it is for

For buildings that should not need five crews for one facade.

Often repair is not a separate project. It is what paint or insulation needs to bond.

Walls that have opened up

Cracks in plaster, lost corners, hollow-sounding spots. Paint on top only redraws them.

Before painting or external insulation

If the base is not repaired, the new system sits on failure. We say so before we start, not after it shows.

Small interventions inside the home

A hole from a fitting, a changed frame, a ceiling that needs work before paint.

Jobs others treat as small

We take them on. Small repair follows the same sequence, because big damage often starts there.

Why this approach

Why not leave it for later.

The result on the wall is usually bigger than the sample.

A crack is information

A hairline in plaster is not the same as movement. We do not fill them all the same way.

Hollow-sounding plaster will go

If it stays, paint and insulation bond to air. Better it goes now, on a surface we control.

One crew, one sequence

When repair, prep and paint are ours, there is no gap between one crew fixing and another painting.

Small jobs are not second class

We say this across PaintPro. It applies here too.

Why us

Whatever we take on, we finish.

General repairs exist so the main work — external insulation and painting — comes out right. We do not collect every odd job to fill the diary.

If it is outside what we do, we say so. If it is ours, we take it with warranty. Halkidiki and Thessaloniki.

Request a quote
01

We see what the wall needs

Not a phone list. Repair is judged on site.

02

We separate what goes and what stays

Failed material out. What is sound stays and is prepared.

03

Repair

Plaster, fillers, reinforcement where cracks need it. Time to cure, not rush to paint the same day.

04

Tied to painting or external insulation

Repair is handed over ready for the next stage, whether we do it next or tell you when it is time.

From our work

Repair projects

General repairs, PaintPro

Next step

Tell us what has opened up. We will say if it is our work.

Tell us what you see on the building. Small or large job — we listen the same way. Based in Nea Moudania, working in Halkidiki and Thessaloniki. Contact: Mëziu.